National Repository of Grey Literature 5 records found  Search took 0.01 seconds. 
Connection of streets in Holásky and Brněnské Ivanovice
Vajda, Ronald ; Holcner, Petr (referee) ; Všetečka, Martin (advisor)
This thesis deals with the interconnection of V holáskách and Brněnské Ivanovice streets. The aim of this work is to design a traffic-urban study of the BI-2 site according to the Draft Zoning Plan of the City of Brno. I focused on the suitability and method of connecting the streets V Aleja, Sladovnické, Jubilejní, Rolencově and the examination of the establishment of the railway stop Holásky. After studying the topography and elevation, I proposed various connections of these streets. I examined them in direction, width and height and on the basis of the results I proposed new suitable connections for different modes of transport. I then designed the layout of the plots and buildings on the basic traffic skeleton. A reasonable layout resulted in a population of 1,022. The population density works out at 101 inhabitants/ha. There are 38 % of public areas and 62 % of non-public areas. The results of this work allow for better decision making when processing further detailed documentation and deciding on the further use of the area. It is also beneficial that development site BI-2 is connected to the second development site Ho-2 by a footbridge that runs over the railway. The main result is that the connection of the streets is realistic and the establishment of a railway station is also possible.
Development of local roads in Přibyslavice
Dušek, Martin ; Halodová, Klára (referee) ; Všetečka, Martin (advisor)
The aim of the diploma thesis is to help the town of Přibyslavice with the development of local communications. This includes project work based on the current needs of the town and related consultations with local representatives and building authority. First, a passportization of local communications was drawn and subsequently, widening of the communication network by three new roads was suggested. This will enable creation of new building plots. New sewage and rainwater drainage, together with water conduit, were designed. Emphasis was put on avoiding interference with plots not owned by the town, on comfortable access to currently used plots, safe connection to the existing regional road no. III/3798, and sufficient radius for passage of firefighters and a garbage truck.
Intersection of streets Nádražní and Zeyerova in Písek - Study
Větrovcová, Pavla ; Čepil, Jiří (referee) ; Radimský, Michal (advisor)
The subject of the diploma thesis is the study of the intersection of the street station and Zeyerova in the town of Písek in the South Bohemian Region. It is a translucent light traffic junction of local roads. In its vicinity there are Elementary School, Elementary Art School and Kindergarten. The aim of the thesis is to increase the safety of the operation of the construction of intersections of local roads.
Intersection of streets Nádražní and Zeyerova in Písek - Study
Větrovcová, Pavla ; Čepil, Jiří (referee) ; Radimský, Michal (advisor)
The subject of the diploma thesis is the study of the intersection of the street station and Zeyerova in the town of Písek in the South Bohemian Region. It is a translucent light traffic junction of local roads. In its vicinity there are Elementary School, Elementary Art School and Kindergarten. The aim of the thesis is to increase the safety of the operation of the construction of intersections of local roads.
Development of local roads in Přibyslavice
Dušek, Martin ; Halodová, Klára (referee) ; Všetečka, Martin (advisor)
The aim of the diploma thesis is to help the town of Přibyslavice with the development of local communications. This includes project work based on the current needs of the town and related consultations with local representatives and building authority. First, a passportization of local communications was drawn and subsequently, widening of the communication network by three new roads was suggested. This will enable creation of new building plots. New sewage and rainwater drainage, together with water conduit, were designed. Emphasis was put on avoiding interference with plots not owned by the town, on comfortable access to currently used plots, safe connection to the existing regional road no. III/3798, and sufficient radius for passage of firefighters and a garbage truck.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.